I went for a run this morning, and commented to my running partner that the bridge works were due to begin today (no sign of any activity).
On the way back 45 mins later a gang of workmen were setting up barriers, traffic lights, crossing lights etc.
So, this is it folks, let the games begin. 6 months of Joy!
Tags for Forum Posts: traffic, wightman bridge, wightman bridge closure
Oh, agreed. That display board doesn't show anything for the Salisbury Rd/Green Lanes/Warham Rd junction, which will need a 'no through route' warning. And I hope it's better managed than it was recently, when Amir got a penalty notice despite following the signed diversion - this thread.
However, the initial presentation in December, followed up by Hugh, has a slide peppered with red blobs to show locations of warning signs, including four around that junction. Link here, 3rd attachment, slide 10.
I think they said this was happening this/next week
Yes I've seen signs out as far as the Roundway. Only observation is the letter size used is rather small so when driving even at 20 mph you don't get a lot of time to scan them.
There's a huge illuminated sign at the Wightman /Turnpike Lane junction.
Thanks John. I haven't been that way for a day or two. There are yet any to appear from mid-Wightman going south to Endymion as I cycle most days and have been looking out for them.