Tags for Forum Posts: harringay traffic study, traffic
On the consultant's documentation costs for WR package 4 are:
1a Wightman Road closed (filtered). Cost low-high
1b Improve cycle conditions. Cost low
1c Move pavement parking onto carriageway. Cost low
1d Mitigation measures across a wider area. Cost very high
Definitions of Costs:
Low Up to £100k
Medium £100k–£500k
High £500k–£1m
Very high >£1m
So I don't think this option will come within the £350K existing budget, I assume extra funds will need to be found.
Julie - "Very high" refers to the long term variant. The short term variant could be achieved relatively quickly with much lower cost. The variants are described in the engagement docs from p32 here
There isn't a short or long term variant listed for 1d, mitigating measures, the only cost in that section is listed as 'very high'.
The long and short term variants are for the closing/filtering of Wightman Road, cycle improvements and moving parking (1a, b and c). [sorry edit to say I'm wrong the only one with short-long variant listed is 1a. I'm reading pages 35&36 of the document you linked to]
So IMHO the mitigating measures would need to be funded, researched and implemented before anything else.
© 2024 Created by Hugh. Powered by
© Copyright Harringay Online Created by Hugh