We've been informed that will be traffic delays on the High Road N22 at the junction with Brampton Park Road
Apparently there is a collapsed Thames Water inspection cover at the above location which requires extensive repairs. Temporary traffic signals will be in use and severe delays to traffic are expected.
The works are expected to last 3 to 4 days.
Tags (All lower case. Use " " for multiple word tags):
© 2024 Created by Hugh. Powered by
© Copyright Harringay Online Created by Hugh