The BBC is reporting that the 94 new fully walk-through Siemens trains with air-conditioning won't make their scheduled late 2025 introduction.
TfL told the broadcaster that "more challenging engineering complexities" than had been expected, will delay the rollout until the second half of 2026.
Tags (All lower case. Use " " for multiple word tags):
© 2025 Created by Hugh.
Powered by
© Copyright Harringay Online Created by Hugh