I'm afraid that Engineering work is blocking the line through Harringay Green Lanes this Sunday morning and the bus times for the Seven Sisters - Highgate Road replacement bus are still not available. Details of planned alterations to the service until the end of January are attached.
Glenn Wallis
Secretary
Barking-Gospel Oak Rail User Group
barking-gospeloak.org.uk
@RidingtheGoblin
Tags (All lower case. Use " " for multiple word tags):
When a late night train is shown as terminating at Upper Holloway, I assume this is because it is due to by-pass the Gospel Oak bay platform and continue to the depot at Willesden Junction. I wonder if it would be feasible to allow passengers to remain on the train, which could then set them down at, say, Hampstead Heath to make connections to services on the Mildmay Line.
© 2025 Created by Hugh. Powered by
© Copyright Harringay Online Created by Hugh